10 Houses, Crudwell.
698m2 of preparation works installing a 75mm insulation package and a 75mm traditional reinforced fibre screed.
Installed in 10 days to site programme.
Cancer Treatment Center, Newcastle.
338m2 of preparation works and final wearing surface self levelling screed installed at a thickness 5-10mm
Installed in 2 days with a two man team.
Cancer Treatment Center, Newport.
210m2 of preparation works and self levelling screed installed at a thickness 5-10mm
Installed in 1 day with a three man team.
Domestic House, Blaenavon.
92m2 of 75mm traditional sand, cement and fibre screed installed over damp proof membrane.
Installed in 4 hours with a 3 man team.
Domestic Patio, Cowbridge.
35m2 of resin bound installed to garden patio area over concrete.
Installed in 2 hours with a 2 man team.
Barn House, Bognor Regis.
60m2 of 75mm traditional sand, cement and fibre screed installed over underfloor heating.
Installed in 2 hours with a 3 man team.
4 Flats, Jubilee Park, Rogerstone, Newport
282m2 of Iso Rubber acoustic insulation system and a 75mm traditional sand, cement and fibre screed installed.
Installed in 2 days to sites programme.
Domestic House, Swansea
190m2 of a traditional sand, cement and fibre screed installed at a thickness of 75mm over underfloor heating.
Installed in 1 day with a 4 man team.
Extension, Nailsworth.
80m2 of a traditional sand, cement and fibre screed installed at a thickness of 75mm over underfloor heating.
Installed in 1 day with a 2 man team.
3 Flats, Caerphilly.
180m2 of a Sika level 25 (self levelling compound) installed at a thickness 5mm - 25mm
Installed in 2 days with a 2 man team.
Mandrake House, Rogerstone, Newport
20 Flats,
1530m2 of Iso Rubber acoustic insulation system and a 75mm traditional sand, cement and fibre screed installed.
Installed in 13 days to sites programme.
Winson Coaches, Loughborough.
810m2 of a polymer Isopol SBR screed installed at a thickness of 25mm.
Installed in 6 days with a 4 man team.
Domestic Coach House, Ross on wye
210m2 of traditional sand, cement and fibre screed installed at a thickness of 75mm over underfloor heating.
32ton.
Installed in 1 day with a 4 man team.
Co-Operative Shop, Swansea
247m2 of traditional sand, cement and fibre screed installed at a thickness of 105mm.
50ton.
Installed in 1 day with a 6 man team.
Llantarnam Primary School, Newport
3500m2 of traditional sand, cement and fibre screed installed at a thickness of 75mm over underfloor heating.
Installed around sites program within 5 weeks.
Domestic House, Sketty, Swansea.
120m2 of traditional sand, cement and fibre screed installed at a thickness of 75mm.
20ton of screed.
Installed in 1 day by a 3 man team.
Outside Patio area, Penarth.
100m2 of traditional sand, cement and fibre screed installed at a thickness of 75mm.
16ton of screed.
Laid falling towards the drains away from the house.
Installed in 1 day by a 3 man team.
Krispy Kreme in Peterborough.
300m2 of a polymer Isopol SBR screed installed at a thickness of 75mm.
Installed in 2 days.
Hungry Horse Pub, Swindon.
870m2 of traditional sand, cement and fibre screed installed at a thickness of 75mm.
150 ton of screed.
Installed in 2 days by a 7 man team.
Marston Pub, The Blaina Wharf, Newport.
568m2 of traditional sand, cement and fibre screed installed at a thickness of 75mm.
94 ton of screed.
Installed in 3 days.
We have completed 26 Marston pubs all around the UK to date with a perfect installation on each project.
Police Custody Suite, Merthyr Tydfil.
1264m2 of acoustic insulation and traditional sand, cement and fibre screed installed at a thickness of 75mm.
208 ton of screed.
Installed in 10 days.
Bronte House, Newport Road, Cardiff.
30 Apartments
2,235m2 of Monarfloor acoustic insulation and traditional sand, cement and fibre screed installed at a thickness of 75mm.
368ton of screed.
Installed in 21 days.
T.S Bloors, Leicestershire.
1000m2 of Isopol SBR screed installed at a thickness of 90mm.
200ton of Screed
Installed in 10 days.
Isopol SBR is used to produce polymer modified wearing screeds for heavy duty and industrial flooring and for rapid drying, leveling screeds to receive various types of floor finishes.
Bridgend, South Wales
55m2 of polythene, 75mm insulation and 75mm traditional sand, cement and fibre screed installed.
9ton of Screed.
We install 3-4 houses like this in one day to give you an idea on the timescale we work on. Includes insulation and screed on the same day.
We work on many big housing sites across South Wales which have been going on for 10 years for multiple different Contractors.
Small Domestic swimming pool, Cardiff
38m2 of traditional sand cement and fibre screed laid to falls to create different levels for the swimming pool.
Installed in 1 day.
Small Domestic House, Ross On Wye
120m2 of traditional sand, cement and fibre screed installed between a thickness of 75-90mm.
24 ton of screed.
Installed in 1 day.
Small Domestic Wet Room, Bassaleg, Newport.
4m2 of resin bonded quartz carpet system laid at thickness of 5mm using 1-2mm pebbles.
2 coats of thixotropic sealer on top of dry pebble screed.
Installed in 2 hours, over the period of 2 days due to drying times.
24 apartments, Cardiff.
2,520m2 of self leveling floor screed at a thickness between 3mm-6mm.
6 days to install.
Large housing site, Aberdare.
110m2 of Traditional sand, cement and fibre screed at thickness of 75mm laid over the top of underfloor heating installed to house.
17 ton of screed,
Installed in one 1 day.
Newport, Bristol, Bridgend, Abergavenny, Crickhowell, Monmouth, Raglan, Usk, Cwmbran, Pontypool, Newport, Merthyr Tydfill, Abderdare, Vale of Glamorgan, Ebbw Vale, Abertillery, Pontypridd, Monmouthshire, Gwent, Chepstow, Caldicot, Ross-on-Wye, Swansea, Neath, Cardiff, Penarth, Cowbridge, Barry, Brecon, Lydney, Blackwood, Caerphilly, Rhonda Cynon Taff, Dinas Powys, Porthcawl, Maestag,